The Well head Control Panel (WHCP) is a hydraulically operated system that allows for the safe control of a single oil or gas well head’s valves.
One mill grain was installed without any automatic operations, since it operated for more than 10 years manually, our team is working to arrange the entire operation
We are being asked by Raban AL Safina R&D Department to set up a monitoring system for kiosks to ensure that they run properly.
AL-Haramain Substation is an EPC project implement by Raban AL Safina. ALTAMEER was being asked to install a fully automatic Supervisory Control and Data Acquisition system
ALTAMEER is being asked by Ministry of Electricity to design, implement & operate SCADA system for twenty 33/11 KV GIS Substations in southern of Iraq.
for this project, we are currently working on, were given the very important task to creating a system to help the environment by detecting oil spills.
The main objective of this project is to protect important places within the Raban Al Safina &Siemens factory which covers an area of (100,000) m2 in Al-Najaf city with precision
This was one of our project in the field of protection. For the Al-Wazerya project, we connected multiple sites with intranet and Internet services using the latest technology like fiber optic technology, wireless technology, and Voice over IP technology.
ALTAMEER has been awarded the project for a Centralized and Web Based Access Control and Time Management System for the South Oil Company (ACS for SOC Project). This system came to meet South Oil Company’s (SOC) future time attendance requirements.